Wednesday, September 29, 2010

National Energy Conservation Awards 2010_Questionnaire for Thermal Power Stations (Newly Introduced this year)

Source: http://www.emt-india.net/eca2010/2010.htm

NATIONAL ENERGY CONSERVATION AWARD - 2010

(Thermal Power Stations)

Award for Excellence in Energy Conservation and Management

OBJECTIVE

To give national recognition to the selected Thermal Power Stations (TPS) who have made systematic and serious attempts for efficient utilization and conservation of energy during the years 2008-09 and 2009-10.The Scheme for Thermal Power Station is being introduced for the first time in the EC Award 2010.

THE AWARDS

First and second prizes are proposed to be given in the form of a Silver Plaque with appropriate citation on such awards .The third prize will be in the form of “Certificate of Merit”. The performance of TPS would be judged through the questionnaire (format enclosed) which would be evaluated by an Award Committee.

ELIGIBILITY

The scheme is open to all Thermal Power Stations using coal, lignite, biomass, liquid and gas as fuel.

Criteria for Judging Merit

a) Evaluation of the nominations will be done in two phases, based on the Evaluation and Weight age criteria as given in Part –I and based on the Evaluation and weightage criteria as given in Annexure-A

b) In the first phase, evaluation will be made on the basis of the preliminary information, as required in Part - I and the best 10% of the participating industries (subject to minimum of 4 units) from each sector would be short listed.

c) These shortlisted industries would then have to submit the details of the savings made and the projects implemented, as required in Part-II within 8 days from the date of intimation by BEE.

d) The members of the Award Committee or their nominees may visit participating TPS for verification of data supplied, if felt necessary and it will be obligatory on the part of the participating TPS to provide necessary
co-operation. The TPS have to bear all the expenditure in this connection.

e) The Committee's decision would be final and no appeal would be entertained.

Instructions for Filling up the ‘Award Questionnaire’

a) The data required for the questionnaire pertains to the accounting years 2008-09 & 2009-10. If calendar year is the accounting year, then data should pertain to the years 2008 and 2009.

b) The enclosed questionnaire is only a format and thus information sought should be separately computer printed or neatly typed or to be downloaded from the Bureau’s Website: www.bee-india.nic.in and www.energymanagertraining.com

c) The answers to the questions should be precise and specific and should be

supplied in total compliance with the questionnaire format. The deviations

may lead to improper evaluation or the rejection of the nomination.

d) The information sought under any head should be highlighted under the same and no separate annexure should be attached.

e) Each and every query mentioned in the questionnaire needs to be answered. Even, if answer is ‘NO' or `NOT APPLICABLE' the same may be stated, instead of ignoring it.

f) The questionnaire should be filled in by a competent and responsible person of the company. He/ she should be fully conversant with the energy terms and units, conversion / multiplying factors etc. The duly filled-in questionnaire should be signed by the Chief Executive of the TPS.

Submission of nomination

Filled in questionnaire should reach the office of

Director General

Bureau of Energy Efficiency

4th Floor, Sewa Bhawan

R. K. Puram, New Delhi-110 066

Tel. No.: 011-2617 9699 (5 lines)

Fax No.: 011- 2617 8328, 2617 8352

Latest by 20th October, 2010

Note:

1. The current year’s Questionnaire is a revised version and contains some changes at appropriate places. Therefore, please do not use the last year’s Questionnaire while submitting your application for consideration of Award

2. You may download the Questionnaire from www.bee-india.nic.in & www.energymanagertraining.com.

3. The filled in application can also be e–mailed at awards@beenet.in followed by submission of duly signed hard copy by post at BEE office address.

Part – I (To be submitted by 20th Oct. 2010)

National Energy Conservation Award-2010

(Thermal Power Stations)

“Award Questionnaire”

1

Name of the Thermal Power Station with complete postal address.

2

Name of the State/ UT

3

Type of Thermal Power Station (Please mark þ)

¨ Coal / ¨ Lignite / ¨ Liquid Fuel / ¨ Mixed Fuel /

¨ Gas/ ¨ Biomass Fuel Fired/ ¨ Diesel

¨ Combined Cycle Gas Turbines (CCGT)

¨ Open Cycle Gas Turbine (OCGT)

¨ Cogeneration Plants

¨ Diesel Generating Sets

¨ Others (Please specify)

4.

Chief Executive’s name & designation with mobile, telephone, fax nos. & e-mail.

5

Name, designation, address, mobile, telephone, fax nos. & e-mail of Certified Energy Manager appointed or designated under EC Act

6

Energy consumption in metric ton of oil equivalent (MTOE) in the current financial year 2009-10

7

Thermal Power Station Design (Coal / Lignite / Liquid Fuel / Mixed Fuel / Gas/ Biomass Fuel / Diesel Fired) Details

( TPS of above type to submit Station Design Details information in this table)

7

Particulars

Current completed

financial year

2009-10

Previous completed financial year

2008-09

(To be filled only in case of change in comparison with current year data)

Design details

(a)

Capacity of the station (MW)

(b)

Average Station Gross Heat Rate on GCV basis of the fuel used, (kcal/kWh)

(c)

Station Net Heat Rate on

GCV basis of the fuel used, (kcal/ kWh)

(d)

Station Auxiliary Power Consumption (%)

(e)

Station Secondary Fuel Oil Consumption (ml/kWh)

8. Thermal Power Station Operating Details

(All type of Thermal Power Stations to submit detailed Operating information in this table)

8

Annual Operating Parameters

Current completed financial year

2009-10

Previous completed financial year

2008-09

8 (a)

Overall Station Generation (Million kWh/year)

8 (b)

Overall Station PLF (%)

8 (c)

Coal/ Lignite/ Biomass Consumption (Million Metric Tonne) (Please specify the name of Fuel used)

Overall Station fuel consumption (Coal/ Lignite/Biomass Consumption) (Million Metric Tonne/ year)

Average Gross Calorific Value (GCV)of fuel (kcal/kg)

Overall Thermal energy used in the station due to the use of above fuel

(Billion kcal/ year)

8 (d)

Oil Consumption (kL)(mention FO/ LSHS/ RFO/ Naptha/HSHS/HSD/other liquid fuel as applicable)

Overall Station Oil Consumption (kL/ year)

Average Gross Calorific Value (kcal/Litre or kcal/kg, please specify)

Overall Thermal energy used in the station due to the use of above fuel

(Billion kcal/ year)

8 (e)

Gas Consumption at STP (Million Cubic Meter)

Overall Station Gas Consumption at STP (Million Cubic Meter)

Average Gross Calorific Value at STP (kcal/Cubic Meter)

Overall Thermal energy used in the station due to the use of above fuel

(Billion kcal/ year)

8 (f)

Other fuels used (Please specify- Solid Waste/ Liquid Effluent/ Waste gas/ By product gas/ etc.) – Provide data on similar lines of coal / oil / gas, as applicable.

Overall Station fuel Consumption ( please specify units_____________________)

Average Gross Calorific Value ( please specify units_________________________)

Overall Thermal energy used in the station due to the use of above fuel (Billion kcal/ year)

8 (g)

Gross Heat Rate on GCV basis (kcal/ kWh)

Overall Station Gross Heat Rate on GCV basis (kcal/ kWh)

* Note: Cogeneration Plants to mention Fuel Quantity used only for power generation

* For computing fuel consumption for power generation following relation may be used

1.

2. Fuel consumption for power generation = Total fuel consumption – fuel consumption for process (specify unit)

8

Annual Operating Parameters (continued) …

Current completed financial year

2009-10

Previous completed financial year

2008-09

8 (h)

Net Heat Rate on GCV basis (kcal/ kWh)

Overall Station Net Heat Rate on GCV basis (kcal/ kWh)

8 (i)

Auxiliary Power Consumption of Gross Energy Generated (%)

Overall Station Auxiliary Power Consumption (%)

9. Annual Energy savings achieved and investment made due to implementation of Energy Efficiency improvement measures

9

**Annual Energy savings achieved and investment made due to implementation of Energy Efficiency improvement measures

Current completed financial year

2009-10

Previous completed financial year

2008-09

9 (a)

Electrical Energy Savings (Million kWh/ year)

9 (b)

Electrical Energy Savings (Lakh Rs/ year)

9 (c)

Coal / Lignite Savings ( Million Tonnes/ year)

9 (d)

Oil Savings (KL/ year)

9 (e)

Gas Savings (Million M3 at STP/year)

9 (f)

Other fuel savings ( Please specify and also mention units)

9 (g)

Total fuel savings (Million kCal/ year)

9 (h)

**Total fuel savings (Lakhs Rs/ year)

9 (i)

Total annual energy savings (Lakhs Rs/ year)

9(b) + 9(h)

9 (j)

Investment made on energy conservation measures (Lakhs Rs/ year)

Note: Annual energy savings to be worked out based on the difference in the energy consumption before implementation of the project and energy savings achieved after implementation of the project in the identified area/ equipment in the reference year. The overall energy savings of all the implemented projects to be mentioned in the appropriate column. The energy savings achieved to be only the first year annual savings and should not include the savings achieved due to implementation of the projects in the previous years.

I ………………………………………………… solemnly declare that to the best of my knowledge the information given in the Award Questionnaire (National Energy Conservation Award-2010) thereto is correct and complete

……………………………………………………………..

(Signature of the Chief Executive)

Name and Designation of Chief Executive_________________________________

Organisation Seal……………………………………….

Date:

Place:

PART-II (To be submitted after intimation by BEE)
NATIONAL ENERGY CONSERVATION AWARD - 2010
(THERMAL POWER STATIONS)
"Award Questionnaire"



1 Name of the Thermal Power Station
2 Type of the Thermal Power Stations
3 Complete address of TPS location
(including Chief Executive's name & designation)
with mobile,telephone,fax nos. & e-mail
4 Name, designation, address, mobile, telephone, fax nos. & e-mail of responsible person who could be contacted in connection with the application for Award
5 Please provide details in the following format on major energy efficiency improvement projects/ measures including in-house R&D efforts, technology innovation, energy substitution and renewable energy systems commissioned during the year 2009-10 giving energy savings achieved. (please also fill-up the Part II - Annexure for the Energy Conservation Measures implemented during the year 2009-10).
Year of Commissioning of the projects Project description Achievement of Annual energy savings in 2009-10 Investment incurred on the project Rs. (Lakhs)
Electricity Fuels* Total savings in (Rs. Lakhs)
(Lakhs kWh) Coal (tonnes) F.Oil
(kL)
Gas (lakh Nm3) Total (fuel) in (MTOE)
(i) Please list the projects title names which were implemented during the year (ii) Please mention the achievement of energy saving against each projects in the suitable columns.
2009-10

* Delete or add fuels as the case may be






















I, ………………….. Solemnly declare that to the best of my knowledge the information given in the Award Questionnaire (National Energy Conservation Award-2010) thereto is correct and complete.












(Signature of the Chief Executive)



Date:








Place:
Name & designation of the Chief Executive ………………………………



Mobile No. …………………………...…………













Organisation Seal ………………………………………











DOCUMENTS ATTACHED:
















1. Copies of Certificate pertaining to statutory requirements such as safety and pollution control for the period 2009-10 are enclosed.

2. A brief write up of the unit (not more than 3-4 pages) along with photographs depicting equipment / locations where energy efficiency activities have been undertaken and a CD containing the same is attached (Sample writeup may be seen at www.bee-india.nic.in)












Note: The Part-II and Part-II-Annexure to be kept ready and to be dispatched immediately after the intimation sent by BEE

Part-II-Annexure

(To be submitted along with Part –II after intimation by BEE)

Energy Conservation Measure implemented in 2009-10

(To be filled up separately for each Energy Conservation Measure implemented)

ID to be filled by BEE

Title of the measure

Sector…TPS

Year: 2009-10

Technology ………………

Description of the energy conservation measure:

Picture/ sketch/ drawing before modification

(if available)

Picture/ sketch/ drawing after modification

Agency that executed the project (with complete address and email):

Total investment, Rs.

Year of implementation:

First year energy cost savings, Rs.

First year other savings, Rs.

On annual basis

kWh

Coal

(Tonnes)

Gas

Nm3

Oil

(kL)

Other

Energy consumption before

Energy consumption after

Energy tariff, Rs/ kWh/ Tonnes/ Nm3/ kL …

Plant/ Establishment complete address:

Contact person who could be contacted for more information:

We authorise Bureau to use this information for dissemination

Signature

Date










Note: Please submit this sheet separately for each Energy Conservation Measure implemented in 2009-10 and a CD containing the above information may be enclosed.

Annexure - A

NATIONAL ENERGY CONSERVATION AWARD – 2010

Evaluation and weight age criteria – THERMAL POWER STATIONS

Sr. No.

ITEM

Max 50 marks

1

ENERGY SAVINGS – ELECTRICAL & THERMAL

i

% saving in Electrical Energy over previous year (2008-09)

(10 marks)

ii

% saving in Thermal Energy over previous year (2008-09)

(10 marks)

2

STATION GROSS HEAT RATE IMPROVEMENT

% improvement in Station Gross Hear Rate during 2009-10 over 2008-09

(15marks)

3

% AUXILIARY CONSUMPTION REDUCTION

% improvement in Auxiliary Consumption over previous year (2008-09)

(10 marks)

4

Comparison of % deviation of Operating Station GHR from the Design GHR Parameters with the best reported deviation values among the participating TPS

(5 marks)

Note:

1. For all the evaluation criteria, if the difference between the first and second unit in the particular criteria is more than 10% in the percentage score, then the second best unit will be awarded 20% less marks than that of the first unit and prorate will start from that unit onward. Similarly, if the difference between second and third unit is also found to be more than 10% ,the above methodology will be followed till the completion of the evaluation criteria of all the units

2. Award Committee reserve the right to modify the Evaluation & Weightage criteria, if the application of the above criteria may not be feasible due to certain peculiar characteristics of the reporting units, the modified criteria shall be uniformly applied to all the participating units.

3. If it is found that the GHR improvement / Auxiliary Consumption reduction is exceptionally high mainly due to increased capacity utilization and is affecting the weight age of other units, Award Committee reserve the right to modify the Evaluation & Weight age criteria for that sector